Sequence 40.00_03_46_20.Still003_border
Water Gold Soil: Report, Draft 2, Sayler/Morris, 2015, 2-channel video (still), 17 min. The pipes depicted here in the right channel of the video are part of infrastructure originally built to support gold mining by regulating flow in the South Fork of the American River. The same infrastructure was later re-purposed for irrigation agriculture and suburban development. Voiceover text: “Pipes followed as if demanded by logic itself…. But the pipes were kept hidden, tucked away. So that a faucet could appear like a stream.”
Like this:
Like Loading...